What We Do

Services

A closer look at each job, including the parts you don't see once the decking's down.

HomeServices

Everything we take on

Every job below is one we do ourselves across Madera.

Deck Installation

We build new decks in cedar, redwood, or composite, framed with pressure-treated joists sized to your span and load. Footings go below grade and get sized for the soil, not just poured to a standard depth because that's easier.

Deck Repair

Soft boards, sagging joists, and posts that have shifted off their footings all get fixed at the source, not just patched at the surface. If the ledger board's rotted where it meets the house, that gets replaced and reflashed before anything else.

Deck Staining & Sealing

Valley sun bakes exposed wood fast, and an unsealed deck can gray and crack within a couple of summers. We strip, sand, and reseal with a stain rated for UV, and we'll tell you honestly if a board needs replacing instead of just coating over it.

Composite Decking Installation

Composite boards don't need restaining and hold up better against sun and sprinkler overspray than most wood species. We still frame it the same as a wood deck underneath, since the boards aren't what fails first.

Custom Deck Design

Multi-level decks, built-in bench seating, and layouts that work around an existing patio slab instead of ignoring it. We'll sketch it out and price it before any lumber gets ordered.

Deck Railing Installation & Repair

Loose balusters and rails that flex when you lean on them usually mean the post attachment has failed, not just the railing itself. We rebuild to current code, 36 inches minimum for residential, 4-inch max baluster spacing.

Deck Resurfacing & Board Replacement

If the frame underneath is still sound, we can pull worn decking and replace it with new boards without rebuilding the whole structure. This is usually cheaper than a full tear-off if the joists check out.

Deck Demolition & Removal

Old decks that are too far gone get torn out and hauled off, including any footings you want removed if you're changing the layout. We check for buried electrical or irrigation lines before we start digging.

Deck Waterproofing & Flashing

Most deck rot starts where the ledger board meets the house, so we flash that connection with metal flashing and a water-resistant barrier, not just caulk. This is the single biggest thing that determines whether a deck lasts or rots from the inside.

Pergolas & Shade Structures

A pergola or shade cover built over an existing or new deck to cut down on direct sun during the hottest part of the day. Framed to tie into the deck structure, not just anchored to the surface boards.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Madera, CA

These are the areas where we're regularly out building and repairing decks.

Madera, CA
Fresno, CA
Clovis, CA
Merced, CA
Atwater, CA
Sanger, CA
Reedley, CA
Selma, CA
Chowchilla, CA
Kerman, CA
Oakhurst, CA
Common Questions

Things worth asking

Questions that usually come up once a project's underway.

Do I need a permit to build a deck?
Most attached decks over 30 inches above grade require a building permit in California, including footing and framing inspections. Ground-level decks under that height sometimes qualify for exemptions, but local building departments should confirm this before construction starts.
How long does it take to build a deck?
A standard single-level deck typically takes one to two weeks from footing excavation to finished railing, weather and permit timing aside. Multi-level decks with custom features like built-in seating or pergolas usually take three to four weeks.
Can a deck be built on a budget?
Yes, pressure-treated pine decking with a simple rectangular layout and standard railing keeps costs down compared to composite or multi-level designs. Reducing footing count by keeping the deck smaller or single-level also lowers labor and material costs significantly.
Do you offer a warranty on deck construction?
Most deck contractors offer a workmanship warranty covering framing and installation defects for a set period, separate from manufacturer warranties on decking materials like composite boards. Composite decking brands often carry 25 to 50 year material warranties against fading and staining, which is separate from labor coverage.
Will I be dealing with the crew directly or a project manager?
This varies by company; smaller deck building operations often have the same crew lead handling communication and on-site work throughout the project. Larger contractors may assign a separate project manager for scheduling and updates while a different crew handles construction.
What decking materials do you work with?
Common decking materials include pressure-treated pine, cedar, redwood, and composite boards like Trex or TimberTech. Composite costs more upfront but resists rot, fading, and splintering better than wood, especially in hot, dry climates.
Can I still use my backyard while the deck is being built?
Yes, most of your yard remains accessible during construction, though the immediate work area will have tools, lumber, and equipment staged nearby. Direct access to the construction zone itself should be avoided for safety until framing and railing are complete.
What do I need to do to prepare my yard before construction starts?
Clear furniture, planters, and any items near the existing structure or planned build site before the crew arrives. Mark or flag any known irrigation lines, sprinkler heads, or buried cables in the area where footings will be dug.
What happens if you find rot or damage once the old deck is removed?
If hidden rot, termite damage, or a failed ledger connection is found during demolition, the contractor should stop and discuss the issue and added cost before proceeding. This is common on repair or resurfacing jobs where the extent of damage isn't visible until old decking is pulled up.
How do I maintain a new deck once it's finished?
Wood decks should be resealed every one to two years depending on sun exposure, since UV rays and dry heat break down sealant faster in Central Valley climates. Composite decking needs only occasional washing with soap and water, but should still be checked yearly for loose fasteners or shifted boards.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (559) 785-3671